PRODUCTION

Unlike in the concrete industry, it has been an ongoing challenge to develop production lines for timber - particularly construction elements - that combine efficiency with large volumes.

 

TEWO solves this with its standardized building block that runs on a fully automated production line. Our production capacity is ca 210 m2 per 8-hour shift.

 

TEWO´s manufacturing facility is located at Flaen Saw & Planing Mill in Hurdal Municipality, 30 minutes from Oslo´s Gardemoen Airport and just 55 minutes from Oslo. Both Hurdal has a long tradition of timber processing and is located close to key motorways and logistics hubs.

ELEMENT PRODUCTION

We have developed a standardized, insulated mass timber element for mass production.

 

The fully automated TEWO production line, which is one-of-a-kind, became operational in Q1 2020, and has capacity for 420 units per shift, per day.

PANEL PRODUCTION

In 2020 our own production line for three-layered cross-laminated timber (CLT) also became operational. Up to 25,000 m3 per year of locally sourced timber is thereby part of highly sustainable value chain.

 

The production line will manufacture 20 - 60 mm 3-layer panels from spruce to be used in the TEWO elements, as well as offered as a stand alone product.